Stacy spent quite a bit of time digging out and forming the foundation for the windmill. The bolts had to be exactly 5’3” apart and square.
IMG_0994
We also added a lot of rebar and had the corners go down about 3.5 feet.
IMG_1080
Next was concrete! Our favorite labor-intensive work! But the windmill tower will fail before the foundation will!
IMG_1242
Hugh Grim and his son came up to install the windmill. Here they are assembling the tower on the ground.
IMG_1254
They used a rented 42’ reach forklift to hoist the tower in place. Stacy’s hard work paid off as the tower fit perfectly on the bolts in the concrete foundation.IMG_1285
Next they hoisted the motor in place! So exciting to see it go together!
IMG_1290
Hugh attaching the motor to the tower. Note the safety harness he is wearing.
IMG_1301
After the motor was connected, they connected the well to the windmill with a wood pump rod (straight-grain Fir).
IMG_1306
Soon the wind started blowing and we had water! So nice to not have to pump it manually now!